Case study: Cooks River naturalisation
Sydney Water remediated 1.1km of deteriorated concrete stormwater canal along the Cooks River to incorporate more natural bank features with sandstone blocks and native plants. The $8.6 million project included over 100,000 local native plants, creating new areas of...